The basic and pre-requisite requirements included:
• The minimum water supply requirement for the terminal building inclusive of fire fighting etc is 2.0 MGD
to 7.5 MGD which should sustain for 3 to 4 months.
• About 12000 Aft storage capacity is required by constructing a single or
multiple water storage interventions / mini dams.
• Funnel areas of the runways should be avoided being hazardous.
• Catchment Area : 1 .95 Sq km (Approx.).
• Pondage Capacity: 390 Acre ft.
• Available water harvesting potential = 900 Aft.
• Catchment Area: 1.73 Sq km (Approx.).
• Pondage Capacity: 120 Aft.
• Available water harvesting potential = 900 Aft.
• Catchment Area: 1.05 Sq km (Approx.).
• Pondage Capacity:105 Aft (27MG).
• Available water harvesting potential = 900 Aft.
• Catchment Area: 0.85 Sq km (Approx.)
.
• Pondage Capacity: 42 Acreft
.
• Available water harvesting potential = 200 Aft.
• Catchment Area: 0.85 Sq km (Approx.)
.
• Pondage Capacity: 42 Acreft
.
• Available water harvesting potential = 200 Aft.
• Catchment Area: 0.65 Sq km (Approx.)
.
• Pondage Capacity: 57 Acre ft
.
• Available water harvesting potential = 150 Aft.
• Catchment Area: 12.32 Sq km (Approx.)
.
• Pondage Capacity: 1550 Aft (27MG)
.
• Available water harvesting potential = 12088 Aft.